
8A
la
rm
DX100
8.3
A
la
rm Me
ssa
ge List
8-150
EAXA board failure
(1)Reset the alarm.(In case of major alarm, turn the power OFF then back
ON.)
(2)If the alarm occurs again, replace the EAXA board. Save the CMOS.BIN
before replace the board to be safe.
121
The segment_G process did not
complete within the time set on the
scheduling table.
Software operation
error occurred
(1)Reset the alarm.(In case of major alarm, turn the power OFF then back
ON.)
(2)If the alarm occurs again, save the CMOS.BIN in maintenance mode, and
then contact your Yaskawa representative about occurrence status
(operating procedure).
EAXA board failure
(1)Reset the alarm.(In case of major alarm, turn the power OFF then back
ON.)
(2)If the alarm occurs again, replace the EAXA board. Save the CMOS.BIN
before replace the board to be safe.
123
The general-purpose 2ms process
did not complete within the time
set on the scheduling table.
Software operation
error occurred
(1)Reset the alarm.(In case of major alarm, turn the power OFF then back
ON.)
(2)If the alarm occurs again, save the CMOS.BIN in maintenance mode, and
then contact your Yaskawa representative about occurrence status
(operating procedure).
EAXA board failure
(1)Reset the alarm.(In case of major alarm, turn the power OFF then back
ON.)
(2)If the alarm occurs again, replace the EAXA board. Save the CMOS.BIN
before replace the board to be safe.
Alarm
Number
Alarm Name
Sub
Code
Meaning
Cause
Remedy