5-46
CHAS
STEERING
Extent of removal
Order
Part name
Q’ty
Remarks
STEERING REMOVAL
Preparation for
Hold the machine by placing the
removal
suitable stand under the engine.
Number plate
Handlebar
Refer to “HANDLEBAR” section.
Cable guide
Front fender
1
Steering shaft nut
1
2
Front fork
2
Refer to “FRONT FORK” section.
3
Handle crown
1
4
Ring nut
1
Use special tool.
Refer to “REMOVAL POINTS”.
5
Under bracket
1
6
Ball race cover
1
7
Bearing (upper)
1
8
Bearing (lower)
1
Refer to “REMOVAL POINTS”.
9
Ball race
2
Refer to “REMOVAL POINTS”.
Extent of removal:
1
Under bracket removal
2
Bearing removal
2
1
w
Support the machine securely so there is no dan-
ger of it falling over.
23 Nm (2.3 m•kg, 17 ft•lb)
145 Nm (14.5 m•kg, 105 ft•lb)
9
Tighten ring nut.
38 Nm (3.8 m•kg, 27 ft•lb)
9
Loosen it one turn.
9
Retighten it.
7 Nm (0.7 m•kg, 5.1 ft•lb)
TIGHTENING STEPS:
20 Nm (2.0 m•kg, 14 ft•lb)
EC560000
STEERING
Summary of Contents for YZ125(R)/LC
Page 128: ...3 3 INSP ADJ MEMO...
Page 286: ...4 37 ENG CLUTCH AND PRIMARY DRIVEN GEAR 4 Install 9Plain washer 1 9Circlip 2...
Page 566: ...TUN MEMO...
Page 567: ......