20-18 SERVICING INFORMATION
WIRING HARNESS ROUTING
*2
*1
*3
*4
*5
*6
*6
*7
1
Engine stop switch lead wire
*3
Clamp the wiring harness and fuel pump lead wire at
the gray taping. Set the tip of the clamp inside.
2
Handlebars
*4
Bind the magneto lead wire and GP switch lead
wire with the clamp. Set the lock part of clamp out-
side and tip of clamp backward.
3
IAT sensor
*5
Bind the magneto lead wire, GP switch lead wire
and overflow hose with the clamp. Pass the over-
flow hose inside of left engine mounting lower
bracket. Set the tip of the clamp inside.
*1
Bind the engine stop switch lead wire and hot
starter cable with the clamp.
*6
Do not slack the GP switch lead wire at this posi-
tion.
*2
Clamp the IAT sensor lead wire at the gray tap-
ing. Do not clamp IAT sensor lead wire at the
square part of pipe of seat rail. Set the tip of
the clamp downward.
*7
Pass the GP switch lead wire inside of magneto
lead wire.