a. Change to the advanced privilege level:
set -privilege advanced
You can respond
Y
when prompted to continue into advanced mode. The advanced mode prompt
appears (*>).
b. Save any coredumps:
system node run -node
local-node-name
partner savecore
c. Wait for savecore command to complete before issuing the giveback.
You can enter the following command to monitor the progress of the savecore command:
system node run -node
local-node-name
partner savecore -s
d. Return to the admin privilege level:
set -privilege admin
5. Give back the node:
a. From the healthy node, give back the replaced node’s storage:
storage failover giveback -ofnode
replacement_node_name
the
replacement
node takes back its storage and completes booting.
If you are prompted to override the system ID due to a system ID mismatch, you should enter
y
.
If the giveback is vetoed, you can consider overriding the vetoes.
Find the High-Availability Configuration Guide for your version of ONTAP 9
b. After the giveback has been completed, confirm that the HA pair is healthy and that takeover is
possible: storage failover show
The output from the
storage failover show
command. should not include the
System ID
changed on partner
message.
6. Verify that the disks were assigned correctly: storage disk show -ownership
The disks belonging to the
replacement
node should show the new system ID. In the following example,
the disks owned by node1 now show the new system ID, 1873775277:
988
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...