12. Reconnect the cabling to the NSM module:
a. Reconnect the storage cabling to the same two NSM module ports.
Cables are inserted with the connector pull-tab facing up. When a cable is inserted correctly, it clicks
into place.
b. Reconnect the power cord to the power supply, and then secure the power cord with the power cord
retainer.
When functioning correctly, a power supply’s bicolored LED illuminates green.
Additionally, both NSM module port LNK (green) LEDs illuminate. If a LNK LED does not illuminate,
reseat the cable.
13. Verify that the attention (amber) LED on the shelf operator display panel is no longer illuminated.
The operator display panel attention LED turns off after the NSM module reboots. This can take three to
five minutes.
14. Verify that the NSM module is cabled correctly, by running Active IQ Config Advisor.
If any cabling errors are generated, follow the corrective actions provided.
NetApp Downloads: Config Advisor
Hot-swap a power supply - NS224 shelves
You can replace a failed power supply nondisruptively in an NS224 drive shelf that is
powered on, and while I/O is in progress.
About this task
• If you are replacing more than one power supply, you must do so one at a time so that the shelf maintains
power.
•
Best practice:
The best practice is to replace the power supply within two minutes of removal from the
NSM module.
If you exceed the two minutes, the shelf continues to function, but ONTAP sends messages to the console
about the degraded power supply until the power supply is replaced.
•
Best practice:
The best practice is to have current versions of NVMe shelf module (NSM) firmware and
drive firmware on your system before replacing FRU components.
Do not revert firmware to a version that does not support your shelf and its components.
NetApp Downloads: Disk Shelf Firmware
NetApp Downloads: Disk Drive Firmware
• If needed, you can turn on the shelf’s location (blue) LEDs to aid in physically locating the affected shelf:
storage shelf location-led modify -shelf-name
shelf_name
-led-status on
If you do not know the
shelf_name
of the affected shelf, run the
storage shelf show
command.
1534
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...