Option 3: Controller is in a two-node MetroCluster
After completing the NVE or NSE tasks, you need to complete the shutdown of the
impaired node.
To shut down the impaired node, you must determine the status of the node and, if necessary, switch over the
node so that the healthy node continues to serve data from the impaired node storage.
About this task
• If you are using NetApp Storage Encryption, you must have reset the MSID using the instructions in the
"Returning SEDs to unprotected mode" section of
Administration overview with the CLI
• You must leave the power supplies turned on at the end of this procedure to provide power to the healthy
node.
Steps
1. Check the MetroCluster status to determine whether the impaired node has automatically switched over to
the healthy node:
metrocluster show
2. Depending on whether an automatic switchover has occurred, proceed according to the following table:
If the impaired node…
Then…
Has automatically switched over
Proceed to the next step.
Has not automatically switched
over
Perform a planned switchover operation from the healthy node:
metrocluster switchover
Has not automatically switched
over, you attempted switchover
with the
metrocluster
switchover
command, and the
switchover was vetoed
Review the veto messages and, if possible, resolve the issue and try
again. If you are unable to resolve the issue, contact technical
support.
3. Resynchronize the data aggregates by running the
metrocluster heal -phase aggregates
command from the surviving cluster.
controller_A_1::> metrocluster heal -phase aggregates
[Job 130] Job succeeded: Heal Aggregates is successful.
If the healing is vetoed, you have the option of reissuing the
metrocluster heal
command with the
-override-vetoes parameter. If you use this optional parameter, the system overrides any soft vetoes that
prevent the healing operation.
4. Verify that the operation has been completed by using the metrocluster operation show command.
285
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...