Possible loss of data access:
Never slam the drawer shut. Push the drawer in slowly
to avoid jarring the drawer and causing damage to the storage array.
h. Close the drive drawer by pushing both levers towards the center.
i. Repeat these steps for each drawer in the disk shelf.
4. If you are adding multiple disk shelves, repeat this procedure for each disk shelf you are installing.
Do not power on the disk shelves at this time.
Cable disk shelves with IOM12 modules for a new system installation
You cable disk shelf SAS connections—shelf-to-shelf (as applicable) and controller-to-
shelf—to establish storage connectivity for the system.
Before you begin
You must have met the requirements in
Requirements for installing and cabling disk shelves with IOM12
modules for a new system installation
and installed the disk shelves in the rack.
About this task
After you cable the disk shelves, you power them on, set the shelf IDs, and complete system setup and
configuration.
Steps
1. Cable the shelf-to-shelf connections within each stack if the stack has more than one disk shelf; otherwise,
go to the next step:
For a detailed explanation and examples of shelf-to-shelf “standard” cabling and shelf-to-shelf “double-
wide” cabling, see
shelf-to-shelf connection rules
1544
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...