Shelves
Cabling
Shelf 1
a. Cable NSM A port e0a to controller A port e0c.
b. Cable NSM A port e0b to controller B slot 5 port b.
c. Cable NSM B port e0a to controller B port e0c.
d. Cable NSM B port e0b to controller A slot 5 port b.
e. If you are hot-adding a second shelf, complete the “Shelf 2” substeps;
otherwise, go to step 3.
Shelf 2
a. Cable NSM A port e0a to controller A slot 5 port a.
b. Cable NSM A port e0b to controller B port e0d.
c. Cable NSM B port e0a to controller B slot 5 port a.
d. Cable NSM B port e0b to controller A port e0d.
e. Go to step 3.
The following illustration shows cabling for two hot-added shelves:
3. Verify that the hot-added shelf is cabled correctly.
If any cabling errors are generated, follow the corrective actions provided.
NetApp Downloads: Config Advisor
1509
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...