4. Move the battery pack to the replacement controller module, and then install it in the NVRAM riser:
a. Slide the battery pack down along the sheet metal side wall until the support tabs on the side wall hook
into the slots on the battery pack, and the battery pack latch engages and locks into place.
b. Press firmly down on the battery pack to make sure that it is locked into place.
c. Plug the battery plug into the riser socket and make sure that the plug locks into place.
Step 9: Install a PCIe riser
To install a PCIe riser, you must follow a specific sequence of steps.
1. If you are not already grounded, properly ground yourself.
2. Install the riser into the controller module:
a. Align the lip of the riser with the underside of the controller module sheet metal.
b. Guide the riser along the pins in the controller module, and then lower the riser into the controller
module.
c. Swing the locking latch down and click it into the locked position.
When locked, the locking latch is flush with the top of the riser and the riser sits squarely in the
controller module.
d. Reinsert any SFP modules that were removed from the PCIe cards.
3. Repeat the preceding steps for Riser 3 and PCIe cards in slots 4 and 5 in the impaired controller module.
Step 10: Move the power supply
You must move the power supply and power supply blank from the impaired controller
module to the replacement controller module when you replace a controller module.
1. If you are not already grounded, properly ground yourself.
2. Rotate the cam handle such that it can be used to pull power supply out of the controller module while
pressing the locking tab.
CAUTION:
The power supply is short. Always use two hands to support it when removing it from the controller module
so that it does not suddenly swing free from the controller module and injure you.
784
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...