Maintenance 6-15
IMPORTANT:
Check and adjust the system clock before operating the server again after relocating or storing
it.
If the server and the built-in optional devices are moved from a cold place to a warm place in a
short time, condensation will occur and cause malfunctions and breakdown when these are used
in such state.
When you start operating these equipments again after the transportation or the
storage,
make sure to wait for a sufficient period of time to use them in the operating
environment.
If the system clock goes out of alignment remarkably as time goes by, though the system clock
adjustment is performed, contact your sales agent.
Summary of Contents for Express5800/320Fd-MR
Page 13: ...v Appendix B I O Port Addresses This appendix lists factory assigned I O port addresses...
Page 19: ...xi THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 43: ...2 10 General Description Rear View...
Page 47: ...2 14 General Description CPU IO Module CPU IO module...
Page 67: ...2 34 General Description This page is intentionally left blank...
Page 79: ...3 12 Windows Setup and Operation 3 Confirm that RDR of the disk is cancelled...
Page 106: ...Windows Setup and Operation 3 39 This page is intentionally left blank...
Page 198: ...4 92 System Configuration This page is intentionally left blank...
Page 370: ......
Page 371: ...This page is intentionally left blank...
Page 389: ...6 18 Maintenance 3 Stop of PCI module 1 4 Start of PCI module 1...
Page 391: ...6 20 Maintenance This page is intentionally left blank...
Page 465: ...System Upgrade 8 31 board must not be mixed with N8804 005 or N8803 035...
Page 480: ......
Page 483: ......