Installing and Using Utilities 5-61
Procedure in the ft server utility
Perform the procedure below before replacement of a component.
1.
Select the target component by using the ft server utility.
2.
Check the current state of the target component with the LEDs and event log.
3.
Click the [Clear] button in [MTBF Clear] of the target component.
The MTBF clearing result can be verified by the LEDs on the target component. The
result of the MTBF clearing operation is registered in the event log.
4.
Start the component.
Sample screen of ft server utility
[PCI Module]
Summary of Contents for Express5800/320Fd-MR
Page 13: ...v Appendix B I O Port Addresses This appendix lists factory assigned I O port addresses...
Page 19: ...xi THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 43: ...2 10 General Description Rear View...
Page 47: ...2 14 General Description CPU IO Module CPU IO module...
Page 67: ...2 34 General Description This page is intentionally left blank...
Page 79: ...3 12 Windows Setup and Operation 3 Confirm that RDR of the disk is cancelled...
Page 106: ...Windows Setup and Operation 3 39 This page is intentionally left blank...
Page 198: ...4 92 System Configuration This page is intentionally left blank...
Page 370: ......
Page 371: ...This page is intentionally left blank...
Page 389: ...6 18 Maintenance 3 Stop of PCI module 1 4 Start of PCI module 1...
Page 391: ...6 20 Maintenance This page is intentionally left blank...
Page 465: ...System Upgrade 8 31 board must not be mixed with N8804 005 or N8803 035...
Page 480: ......
Page 483: ......