Installing and Using Utilities 5-149
If possible, configure the settings for any applications you installed or upgraded.
If you are satisfied that everything is working correctly, you can merge the system to stop your
applications on the Production Side and restart them on the Upgrade Side for final verification.
If there are any problems, you can abort the upgrade to return the system to its original state.
Aborting the upgrade while the system is in split mode will not incur downtime, because your
critical applications are still running on the Production Side.
TIPS:
Managing Upgrade Tasks on the Upgrade Side, page 5-137
Viewing Active Upgrade Process Status, page 5-158
Merging the System, page 5-150
Aborting the Upgrade, page 5-156
Troubleshooting, page 5-164
Summary of Contents for Express5800/320Fd-MR
Page 13: ...v Appendix B I O Port Addresses This appendix lists factory assigned I O port addresses...
Page 19: ...xi THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 43: ...2 10 General Description Rear View...
Page 47: ...2 14 General Description CPU IO Module CPU IO module...
Page 67: ...2 34 General Description This page is intentionally left blank...
Page 79: ...3 12 Windows Setup and Operation 3 Confirm that RDR of the disk is cancelled...
Page 106: ...Windows Setup and Operation 3 39 This page is intentionally left blank...
Page 198: ...4 92 System Configuration This page is intentionally left blank...
Page 370: ......
Page 371: ...This page is intentionally left blank...
Page 389: ...6 18 Maintenance 3 Stop of PCI module 1 4 Start of PCI module 1...
Page 391: ...6 20 Maintenance This page is intentionally left blank...
Page 465: ...System Upgrade 8 31 board must not be mixed with N8804 005 or N8803 035...
Page 480: ......
Page 483: ......