6-10 Maintenance
OFF-LINE MAINTENANCE UTILITY
The Maintenance Tools is a tool of this product for preventive maintenance, as well as for trouble
analysis and its settings. Follow the below procedure to start the Maintenance Tool.
Starting the Off-line Maintenance Utility
The Off-line Maintenance Utility may be started in the following ways.
NEC Express5800/ft series does not support the feature to start the Off-line Maintenance Utility
from the maintenance partition.]
1.
Boot peripheral devices at first, then power on the Express server.
2.
Load the [EXPRESSBUILDER] DVD into the optical disc drive of the Express server.
3.
After loading the DVD, reset (by pressing <Ctl> + <Alt> + <Delete> keys) or power off and
on to reboot the Express server.
Following menu appears on the DVD.
IMPORTANT:
Default selection is [OS installation] on the menu. When there is no operation for ten seconds
after the Boot Selection menu appears, [OS installation] starts automatically.
Tool Menu:
Select this to launch the Off-line
Maintenance Utility.
Summary of Contents for Express5800/320Fd-MR
Page 13: ...v Appendix B I O Port Addresses This appendix lists factory assigned I O port addresses...
Page 19: ...xi THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 43: ...2 10 General Description Rear View...
Page 47: ...2 14 General Description CPU IO Module CPU IO module...
Page 67: ...2 34 General Description This page is intentionally left blank...
Page 79: ...3 12 Windows Setup and Operation 3 Confirm that RDR of the disk is cancelled...
Page 106: ...Windows Setup and Operation 3 39 This page is intentionally left blank...
Page 198: ...4 92 System Configuration This page is intentionally left blank...
Page 370: ......
Page 371: ...This page is intentionally left blank...
Page 389: ...6 18 Maintenance 3 Stop of PCI module 1 4 Start of PCI module 1...
Page 391: ...6 20 Maintenance This page is intentionally left blank...
Page 465: ...System Upgrade 8 31 board must not be mixed with N8804 005 or N8803 035...
Page 480: ......
Page 483: ......