5-154 Installing and Using Utilities
Committing the Upgrade
When you are finished testing your applications on the merged system, and you are satisfied that
everything is working correctly, you can commit the upgrade to make it permanent.
Committing the upgrade
•
Rebuild the mirror of any internal RDR system disk by overwrititing the original partner disk
with its newer, upgraded partner disk.
•
Rebuild the mirror of any internal RDR data disk by overwriting the stale partner disk with its
newer, activated disk. The stale disk refer to the one that your applications have been writing
data throughout the upgrade process.
•
Does not restart your applications, as they are already running on the upgraded system. There
is no additional downtime.
CAUTION:
You cannot abort the upgrade process after you commit an upgrade
because the original
state of the system is lost (overwritten) as a result of completing the upgrade process. Ensure
that your system is working as expected before clicking
Commit
.
How to commit the upgrade
1.
Close all non-essential applications.
2.
Verify that the upgrade state, as reported in the status bar, is
Fault Tolerant\Merge\Ready
.
3.
Click
Commit
.
IMPORTANT:
Your screen might flicker and you might briefly lose control of your keyboard and mouse as
the system commits the upgrade.
The commit process should take only a few minutes. After it completes, the upgrade state is
Fault
Tolerant\Commit\Ready
. You can click
Finish
to clean up ft series resources, as described in
“Finishing the Upgrade” on page 5-157.
If the commit process fails the first time, you can click
Retry
to try again. If the problem persists,
see “Troubleshooting” for information about resolving the problem.
Summary of Contents for Express5800/320Fd-MR
Page 13: ...v Appendix B I O Port Addresses This appendix lists factory assigned I O port addresses...
Page 19: ...xi THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 43: ...2 10 General Description Rear View...
Page 47: ...2 14 General Description CPU IO Module CPU IO module...
Page 67: ...2 34 General Description This page is intentionally left blank...
Page 79: ...3 12 Windows Setup and Operation 3 Confirm that RDR of the disk is cancelled...
Page 106: ...Windows Setup and Operation 3 39 This page is intentionally left blank...
Page 198: ...4 92 System Configuration This page is intentionally left blank...
Page 370: ......
Page 371: ...This page is intentionally left blank...
Page 389: ...6 18 Maintenance 3 Stop of PCI module 1 4 Start of PCI module 1...
Page 391: ...6 20 Maintenance This page is intentionally left blank...
Page 465: ...System Upgrade 8 31 board must not be mixed with N8804 005 or N8803 035...
Page 480: ......
Page 483: ......