Installing and Using Utilities 5-55
Procedure in NEC ESMPRO Manager
Start
1.
Select the target component in the [ft] tree.
2.
Check the current state with the “Status” display on the target component screen.
3.
Click the [Bring Up] button in the [Maintenance] screen for the target component.
A certain time is required for the start.
The start result can be verified by “State” on the target component screen. The result of
the start operation is reported by the NEC Express5800/ft series as an alert.
Stop
Perform the procedure below before replacing a component.
1.
Select the target component in the [ft] tree.
2.
Check the current state with the “State” display on the target component screen.
3.
Click the [Bring Down] button in the [Maintenance] screen for the target component.
A certain time is required for the stop.
The stop result can be verified by “State” on the target component screen. The result of
the stop operation is reported by the NEC Express5800/ft series as an alert.
Summary of Contents for Express5800/320Fd-MR
Page 13: ...v Appendix B I O Port Addresses This appendix lists factory assigned I O port addresses...
Page 19: ...xi THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 43: ...2 10 General Description Rear View...
Page 47: ...2 14 General Description CPU IO Module CPU IO module...
Page 67: ...2 34 General Description This page is intentionally left blank...
Page 79: ...3 12 Windows Setup and Operation 3 Confirm that RDR of the disk is cancelled...
Page 106: ...Windows Setup and Operation 3 39 This page is intentionally left blank...
Page 198: ...4 92 System Configuration This page is intentionally left blank...
Page 370: ......
Page 371: ...This page is intentionally left blank...
Page 389: ...6 18 Maintenance 3 Stop of PCI module 1 4 Start of PCI module 1...
Page 391: ...6 20 Maintenance This page is intentionally left blank...
Page 465: ...System Upgrade 8 31 board must not be mixed with N8804 005 or N8803 035...
Page 480: ......
Page 483: ......