3.8 Operation Origin Point Setting
3-31
*2
New operation origin point is set.
"
Returning to the Operation Origin Point
In the teach mode
*1
The manipulator moves to the new operation origin point. During movement, the mes-
sage “Manipulator is moving to operation origin point” is shown. The moving speed is
the selected manual operation speed.
In the play mode
When the operation origin point return signal is input (detected at leading edge), the tool cen-
ter point of the manipulator is moved to the operation origin point using the same operation as
the teach mode. However, the speed for this is set in the parameters.
"
Output of the Operation Origin Point Signal
This signal is output any time the current position of the tool center point of the manipulator is
checked and found to be within the operation origin cube.
When the operation origin point is changed, the operation origin cube is automatically set
as cube 24~22 in the base coordinate system.
• The cube 24 is for ROBOT1
• The cube 23 is for ROBOT2
• The cube 22 is for ROBOT3
The operation origin cube is a cube like the one shown in the figure below; the length of its
sides is determined by a parameter setting made by the user (units: µm). By changing this
parameter setting, the size of the cube can be changed.
S3C412: The operation origin cube length of its sides( µm)
Specify whether “COMMAND POSITION” or “FEEDBACK POSITION” is to be set to the
operation origin cube signal’s CHECK MEASURE in the interference area settings. “COM-
MAND POSITION” is the default setting.
Press [FWD] in the operation origin point display
*1
N OT E
P
a
a
a
O peration
Explanation
Summary of Contents for SK300X
Page 2: ......
Page 4: ...SK300X Manipulator Manual XRC 2001 ii MOTOMAN NOTES...
Page 7: ...INTRODUCTION MOTOMAN 1 3 SK300X Manipulator Manual XRC 2001 NOTES...
Page 21: ...viii...
Page 25: ...xii...
Page 41: ...1 7 Notes on MOTOMAN Disposal 1 16...
Page 59: ...4 3 Connection Methods 4 12...
Page 67: ...6 1 Movement of the Axes 6 4...
Page 73: ...8 2...
Page 74: ......
Page 93: ...3 3 Location 3 6...
Page 99: ...4 2 Cable Connection 4 6...
Page 103: ...5 4 Dimensions and Working Range 5 4 Fig 10 b Dimesions and Working Range YR SK300 J1...
Page 104: ...5 4 Dimensions and Working Range 5 5 Fig 10 c Dimesions and Working Range YR SK300 J2...
Page 109: ...6 2 Wrist Flange 6 4...
Page 133: ...9 2 Notes on Maintenance Procedures 9 18...
Page 136: ...11 1 S Axis Driving Unit 11 1 11 Parts List 11 1 S Axis Driving Unit...
Page 138: ...11 2 L U Axis Driving Unit 1 11 3 11 2 L U Axis Driving Unit 1...
Page 140: ...11 3 L U Axis Driving Unit 2 11 5 11 3 L U Axis Driving Unit 2...
Page 234: ...2 8 General I O Signal Assignment 2 72...
Page 270: ...4 4 Recommended Spare Parts 4 30...
Page 285: ...xiv...
Page 286: ...Setup Diagnosis...
Page 287: ......
Page 289: ...1 2...
Page 297: ...2 1 Protection Through Security Mode Settings 2 8...
Page 395: ...3 17 File Initialize 3 98...
Page 417: ...4 2 Addition of Base and Station Axis 4 22...
Page 435: ...5 6 Position Data When Power is Turned ON OFF 5 18...
Page 436: ...Hardware...
Page 437: ......
Page 447: ...6 4 Equipment Configuration 6 10...
Page 456: ...8 8 Open Phase Check 8 8...
Page 476: ...9 4 Recommended Spare Parts 9 20...
Page 477: ...Alarm Error...
Page 478: ......
Page 523: ......
Page 524: ......
Page 525: ......
Page 526: ......
Page 527: ......
Page 528: ......
Page 529: ......
Page 530: ......
Page 531: ......
Page 532: ......
Page 533: ......
Page 534: ......
Page 535: ......
Page 536: ......
Page 537: ......
Page 538: ......
Page 539: ......
Page 540: ......
Page 541: ......
Page 542: ......
Page 543: ......
Page 544: ......
Page 545: ......
Page 546: ......
Page 547: ......
Page 548: ......
Page 549: ......
Page 550: ......
Page 551: ......
Page 552: ......
Page 553: ......