3.9 Tool Data Setting
3-43
*2
Move the cursor to the desired number in the tool list and press [SELECT]. The tool
coordinates of the selected number is shown. In the tool coordinates, change the
desired number by pressing the page key
. To alternate between the tool list and
the tool coordinates, select {DISPLAY} and {LIST}, or {DISPLAY} and {COORDINATE
VALUE} under the menu.
*3
The display for the automatic measurement of the tool load and the center of gravity is
shown.
*4
In a system with several manipulators or stations, use the page key
to change
the group to be controlled.
*5
Press [NEXT] once, and the manipulator moves to the home position (horizontal to the
U-, B- and R-axes).
*6
Press [NEXT] again, and measurement starts. Keep the button pressed until measure-
ment is completed. The manipulator moves in the order listed below. Once measure-
ment is completed, “
*
“ changes to “
'
“.
#
Measurement of the U-axis: U-axis home po 4.5 degrees
)
-4.5 degrees
&
Measurement of the B-axis: B-axis home po 4.5 degrees
)
-4.5 degrees
%
First measurement of the T-axis: T-axis home po 4.5 degrees
)
-4.5 degrees
+
Second measurement of the T-axis: T-axis home po60 degrees
)
+ 4.5
degrees
)
-4.5 degrees
T O O L
TOOL NO. : 0 0
N A M E : T O R C H 1
X
0.000
mm Rx 0.00 deg.
Y 0.000 mm Ry 0.00 deg.
Z 0.000 mm Rz 0.00 deg.
W 0.000 kg
Xg 0.000 mm
!
R1
S
C
L
D A T A
E D I T
D I S P L A Y
U T I L I T Y
L I S T
D I S P L A Y
T O O L
TOOL NO. : 0 0
N A M E : T O R C H 1
X
0.000
mm Rx 0.00 deg.
Y 0.000 mm Ry 0.00 deg.
Z 0.000 mm Rz 0.00 deg.
W 0.000 kg
Xg 0.000 mm
!
R1
S
C
L
D A T A
E D I T
D I S P L A Y
U T I L I T Y
L I S T
D I S P L A Y
W . G R A V . P O S M E A S U R E
TOOL :00
R1:W *.*** kg < STATUS >
HOME
Xg *.*** mm U
Yg *.*** mm B
Zg *.*** mm T(1)
T(2)
!
D A T A
E D I T
D I S P L A Y
U T I L I T Y
R1
S
C
L
C A N C E L
R E G I S T E R
Summary of Contents for SK300X
Page 2: ......
Page 4: ...SK300X Manipulator Manual XRC 2001 ii MOTOMAN NOTES...
Page 7: ...INTRODUCTION MOTOMAN 1 3 SK300X Manipulator Manual XRC 2001 NOTES...
Page 21: ...viii...
Page 25: ...xii...
Page 41: ...1 7 Notes on MOTOMAN Disposal 1 16...
Page 59: ...4 3 Connection Methods 4 12...
Page 67: ...6 1 Movement of the Axes 6 4...
Page 73: ...8 2...
Page 74: ......
Page 93: ...3 3 Location 3 6...
Page 99: ...4 2 Cable Connection 4 6...
Page 103: ...5 4 Dimensions and Working Range 5 4 Fig 10 b Dimesions and Working Range YR SK300 J1...
Page 104: ...5 4 Dimensions and Working Range 5 5 Fig 10 c Dimesions and Working Range YR SK300 J2...
Page 109: ...6 2 Wrist Flange 6 4...
Page 133: ...9 2 Notes on Maintenance Procedures 9 18...
Page 136: ...11 1 S Axis Driving Unit 11 1 11 Parts List 11 1 S Axis Driving Unit...
Page 138: ...11 2 L U Axis Driving Unit 1 11 3 11 2 L U Axis Driving Unit 1...
Page 140: ...11 3 L U Axis Driving Unit 2 11 5 11 3 L U Axis Driving Unit 2...
Page 234: ...2 8 General I O Signal Assignment 2 72...
Page 270: ...4 4 Recommended Spare Parts 4 30...
Page 285: ...xiv...
Page 286: ...Setup Diagnosis...
Page 287: ......
Page 289: ...1 2...
Page 297: ...2 1 Protection Through Security Mode Settings 2 8...
Page 395: ...3 17 File Initialize 3 98...
Page 417: ...4 2 Addition of Base and Station Axis 4 22...
Page 435: ...5 6 Position Data When Power is Turned ON OFF 5 18...
Page 436: ...Hardware...
Page 437: ......
Page 447: ...6 4 Equipment Configuration 6 10...
Page 456: ...8 8 Open Phase Check 8 8...
Page 476: ...9 4 Recommended Spare Parts 9 20...
Page 477: ...Alarm Error...
Page 478: ......
Page 523: ......
Page 524: ......
Page 525: ......
Page 526: ......
Page 527: ......
Page 528: ......
Page 529: ......
Page 530: ......
Page 531: ......
Page 532: ......
Page 533: ......
Page 534: ......
Page 535: ......
Page 536: ......
Page 537: ......
Page 538: ......
Page 539: ......
Page 540: ......
Page 541: ......
Page 542: ......
Page 543: ......
Page 544: ......
Page 545: ......
Page 546: ......
Page 547: ......
Page 548: ......
Page 549: ......
Page 550: ......
Page 551: ......
Page 552: ......
Page 553: ......