![MacDon CASE IH FlexDraper FD225 Manual Download Page 94](http://html.mh-extra.com/html/macdon/case-ih-flexdraper-fd225/case-ih-flexdraper-fd225_manual_685656094.webp)
MAC215986
70
Revision A
1031961
A
B
Figure 3.81: Header Connections
29. Use a clean cloth to remove debris from couplers and
receptacles.
30. Attach the following hydraulic hoses to manifold (B):
•
Knife pressure to port KP on manifold (orange cable tie)
•
Knife return to port KR on manifold (blue cable tie)
•
Draper pressure to port DP on manifold (green
cable tie)
•
Draper return to port DR on manifold (red cable tie)
•
Case drain to port CD on manifold
31. Attach electrical connector C20C (A).
32. Check the float and confirm the header is level. For instructions, refer to the following:
•
•
3.11 Leveling Header, page 239
CAUTION
Be sure all bystanders are clear of machine before starting engine or engaging any header drives.
33. Start the combine and perform the following inspections:
•
Raise and lower the reel to ensure the hoses are properly connected.
•
Run the header to ensure the hoses are properly connected.
34. Check for leaks.