87
HistoCore SPECTRA CV
Daily Instrument Setup
6
1
2
2
3
Fig. 66
6.3.6 Load drawer
Warning
P. 32 – 4.6 Refilling consumables)
must be observed when handling
solvents like xylene!
Fill level check of the reagent vessels in the load drawer
Correct fill level of the reagent vessels
1.
To scan the fill level of the reagent vessels, press the drawer button of the load drawer
2. The load drawer opens.
3. If present, remove the cover for the reagent vessel.
4.
Check that the fill level is sufficient
and the reagent is free of dirt. In the event of
contamination, the xylene is to be replaced
P. 37 – 4.6.3 Prepare the reagent vessel, fill it
and insert it into the load drawer)
and the reagent vessel is to be cleaned before filling it again.
Warning
A reagent vessel fill level that is too low can cause losses in quality during coverslipping.
5.
A sufficient filling level is ensured if the level of the reagent is between the maximum
Summary of Contents for 14051454200
Page 2: ......
Page 149: ...149 HistoCore SPECTRA CV Malfunctions and Troubleshooting 8 1 6 2 7 3 8 4 5 Fig 122...
Page 162: ...162 Version 2 1 Revision K Notes...
Page 163: ......