PS220 Configuration & Operation Guide
PS220 80
Multipump
PS220 Configuration & Operation Guide
5. Configure the Stage and Destage Method
The default value is SPEED or TORQUE
1. “ARROW RIGHT” To change
2. “ARROWS” to change value
3. “Save”
4. “ARROW DOWN”
6. Configure the STAGE PROOF TIME:
The default is 20 Seconds
1. “ARROW RIGHT” To change
2. “ARROWS” to change value
3. “Save”
4. “ARROW DOWN”
7. Configure the DESTAGE PROOF TIME
The default value is 20 seconds.
1. “ARROW RIGHT” To change
2. “ARROWS” to change value
3. “Save”
4. “ARROW DOWN”
8. Configure the MIN PUMPS ON
1. “ARROW RIGHT” To change
2. “ARROWS” to change value
3. “Save”
4. “ARROW DOWN”
Summary of Contents for PumpSmart PS220
Page 1: ...Configuration Operation Manual PumpSmart Control Solutions PS220 v6 05...
Page 22: ...PS220 Configuration Operation Guide 21 PS220 SmartFlow...
Page 261: ...PS220 Configuration Operation Guide PS220 260 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 283: ...PS220 Configuration Operation Guide PS220 282 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 289: ...PS220 Configuration Operation Guide PS220 288 Ecodesign Regulation...
Page 292: ...PS220 Configuration Operation Guide 291 PS220 Fuses heat dissipation chart...