
5-26
SRW-5000/5500
5-6. CTL Head or Full-erase Head Replacement
When it is necessary to replace the CTL head or the full-erase head, replace with the
CTL/FE head assembly.
Outline
Replacement
1.
Removing the CTL/FE Head Assembly
2.
Attaching the CTL/FE Head Assembly
3.
Cleaning (Full-erase head and CTL head)
Adjustment after Replacement
4.
Adjusting the Tape Running (Refer to Sections 6-2 to 6-11.)
5.
Confirming the Tape Running (Refer to Section 6-12.)
6.
Adjusting the Drum Phase (Refer to Section 7-2-3.)
7.
Full Erasure Current Check (Refer to Section 8-8-4.)
Note
Head azimuth, etc. of the CTL/FE head assembly are adjusted when shipping from
the factory.
Never turn the screws in the CTL/FE head assembly. (Except when adjustment)
Tools
.
Cleaning cloth:
3-184-527-01
.
Cleaning fluid:
9-919-573-01
.
Torque screwdriver (6 kgf
.
cm) (JB-5251):
J-6252-510-A
.
Torque screwdriver’s bit (
+
2 mm, l = 75 mm): J-6323-420-A
Preparation
1.
Turn the power off and disconnect the power code.
2.
Remove the upper lid (front) assembly. (Refer to Section 1-3-1.)
3.
Remove the cassette compartment. (Refer to Section 1-5.)
Содержание SRW-5000
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 58: ...1 42 SRW 5000 5500 d l l S G L 6 6 d d 4 8 3 7 2 6 0 1 5 9 ...
Страница 78: ......
Страница 194: ......
Страница 376: ......
Страница 398: ......
Страница 438: ...Printed in Japan Sony Corporation 2005 2 08 B P Company 2004 SRW 5000 SY SRW 5500 SY E 9 968 022 03 ...