![Octel XC1000 Скачать руководство пользователя страница 73](http://html.mh-extra.com/html/octel/xc1000/xc1000_service-manual_723818073.webp)
PLATFORM INSTALLATION
3-9
Edition One
XC1000 Service
3. Remove the burgundy-colored slide panel that covers the circuit breakers
on the power-distribution shelf by pulling it away from the frame.
4. Open the front and rear doors, remove any packing materials, and
remove the grounding straps by pulling the quick-connect lug. Remove
each door as follows:
a. Hold the door and pull down on the spring latch located below
the top hinge of the door.
b. Lift the door off the bottom hinge. Label the door position for
ease of replacement.
5. To prevent cosmetic or other damage, place these doors in a safe place.
6. When facing the front of cabinet 1, remove the right-side cover as
follows:
a. Unscrew the 10 screws that fasten the grounding straps and the
side cover to the cabinet. These 10 screws are located in the
front and back of the cabinet near the edge. Place the screws
and the grounding straps in a safe place.
b. Pull the right-side cover away from the frame.
c.
Reinstall the 10 screws and the grounding strap removed in step 6.a.
7. Remove and save the 10 screws and grounding straps from the right
side of cabinet 2.
8. Attach the right-side cover and the grounding straps (removed in step
6) from cabinet 1 to the right side of cabinet 2. Use the screws saved
in step 7. The facing sides of the cabinets do not have covers.
3.5.1.2
Connecting the Two Cabinets.
Figure 3-4 shows the cabinet-connection
points used to bolt the cabinets together and to connect the intercabinet
signal cables.
Perform the following steps to bolt the two XC1000 cabinets together:
1. Install the four frame-alignment plugs (P/N 065–2008–000) onto the
left side of cabinet 2. Insert the large-diameter end of the plug into the
cabinet frame. Figure 3-7 shows the cabinet-connection points.
2. Secure the four plugs to cabinet 2 using four 8–32 by
5
/
16
–inch
Phillips– head screws (P/N 047–1006–000).
3. Roll the two cabinets together so the frame-alignment plugs enter the
holes in the frame of cabinet 1.
4. From the front of cabinet 1, remove the two mounting screws that
secure the power-distribution assembly to cabinet 1, as shown in
Figure 3-5.
SECTION 3.5
Содержание XC1000
Страница 1: ...EDITION ONE XC1000 P N 101 1345 000 SERVICE MANUAL ...
Страница 8: ...CONTENTS ...
Страница 19: ...1 INTRODUCTION ...
Страница 30: ...2 SITE PREPARATION ...
Страница 60: ...3 PLATFORM INSTALLATION ...
Страница 112: ...4 STARTUP AND INITIALIZATION ...
Страница 177: ...5 ROUTINE MAINTENANCE ...
Страница 195: ...6 TROUBLESHOOTING ...
Страница 237: ...7 STATUS LOG ...
Страница 297: ...STATUS LOG 7 54 Edition One XC1000 Service ...
Страница 302: ...8 REPAIR AND REPLACEMENT ...
Страница 380: ...9 SYSTEM UTILITIES ...
Страница 424: ...10 COMPONENT DESCRIPTIONS ...
Страница 465: ...11 OPTIONAL FEATURES ...
Страница 485: ...12 RELEASE 1 55 UPGRADE INSTRUCTIONS ...
Страница 516: ...13 RELEASE 2 X UPGRADE INSTRUCTIONS ...
Страница 559: ...14 RELEASE 3 02 FCP CONVERSION INSTRUCTIONS ...
Страница 603: ...15 RELEASE 3 02 ONLINE UPGRADE INSTRUCTIONS ...
Страница 631: ...16 RELEASE 3 0 SYSTEM UTILITIES ...
Страница 683: ...17 RELEASE 4 X FCP CONVERSION INSTRUCTIONS r P N 281 0023 002 1 of 3 ...
Страница 725: ...18 RELEASE 4 X ONLINE UPGRADE INSTRUCTIONS r P N 281 0023 002 2 of 3 ...
Страница 760: ...19 RELEASE 4 0 SYSTEM UTILITIES P N 281 0023 002 Part 3 of 3 r ...
Страница 776: ...20 RELEASE 4 1 SYSTEM UTILITIES P N 281 0033 000 ...
Страница 787: ...APPENDIXES ...