![Octel XC1000 Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/octel/xc1000/xc1000_service-manual_723818029.webp)
I
I-1
Edition One
XC1000 Service
INSTALLATION
The
Installation
section is composed of the following chapters:
-
Chapter Two: Site Preparation
-
Chapter Three: Platform Installation
-
Chapter Four: Startup and Initialization
The information in Chapter Two is for preliminary work that must be
completed before the XC1000 arrives at the site. The subjects addressed
include requirements for space, environment, power, and cabling. Environ-
mental requirements include air conditioning, EDS reduction, and ground-
ing. Cabling requirements include cables to locations throughout the
XC1000. Instructions for installing the floor mount are also provided. The
floor mounts for the later installation of the XC1000 must be installed
during the site preparation.
Chapter Three includes information required to install the XC1000, from
the time that it arrives on the shipping dock, is transported to its final
location, and is installed on the floor mounts. During installation, the
cables prepared during the site preparation are connected, the primary SMT
and printer are installed, the logic cards are configured, the switches are
set on the main distribution board, and optional features are configured. If
a dual-cabinet XC1000, connections must be made between the two
cabinets before they are installed.
Following the XC1000 installation, the XC1000 is started up and initialized,
as described in Chapter Four. During initialization, the startup diagnostics
are run, the first-time setup is entered in menu 1, the line types and port
assignments are established in menu 4, and dialing and serial-channel
parameters are established in menu 6. The XC1000 is then verified and
tested and is ready for operation.
Содержание XC1000
Страница 1: ...EDITION ONE XC1000 P N 101 1345 000 SERVICE MANUAL ...
Страница 8: ...CONTENTS ...
Страница 19: ...1 INTRODUCTION ...
Страница 30: ...2 SITE PREPARATION ...
Страница 60: ...3 PLATFORM INSTALLATION ...
Страница 112: ...4 STARTUP AND INITIALIZATION ...
Страница 177: ...5 ROUTINE MAINTENANCE ...
Страница 195: ...6 TROUBLESHOOTING ...
Страница 237: ...7 STATUS LOG ...
Страница 297: ...STATUS LOG 7 54 Edition One XC1000 Service ...
Страница 302: ...8 REPAIR AND REPLACEMENT ...
Страница 380: ...9 SYSTEM UTILITIES ...
Страница 424: ...10 COMPONENT DESCRIPTIONS ...
Страница 465: ...11 OPTIONAL FEATURES ...
Страница 485: ...12 RELEASE 1 55 UPGRADE INSTRUCTIONS ...
Страница 516: ...13 RELEASE 2 X UPGRADE INSTRUCTIONS ...
Страница 559: ...14 RELEASE 3 02 FCP CONVERSION INSTRUCTIONS ...
Страница 603: ...15 RELEASE 3 02 ONLINE UPGRADE INSTRUCTIONS ...
Страница 631: ...16 RELEASE 3 0 SYSTEM UTILITIES ...
Страница 683: ...17 RELEASE 4 X FCP CONVERSION INSTRUCTIONS r P N 281 0023 002 1 of 3 ...
Страница 725: ...18 RELEASE 4 X ONLINE UPGRADE INSTRUCTIONS r P N 281 0023 002 2 of 3 ...
Страница 760: ...19 RELEASE 4 0 SYSTEM UTILITIES P N 281 0023 002 Part 3 of 3 r ...
Страница 776: ...20 RELEASE 4 1 SYSTEM UTILITIES P N 281 0033 000 ...
Страница 787: ...APPENDIXES ...