![Octel XC1000 Скачать руководство пользователя страница 65](http://html.mh-extra.com/html/octel/xc1000/xc1000_service-manual_723818065.webp)
3
3-1
Edition One
XC1000 Service
PLATFORM INSTALLATION
3.1 OVERVIEW
Installing the XC1000 involves ensuring equipment and personnel safety;
obtaining all required tools; unpacking and inspecting the equipment;
positioning the cabinet; attaching the accessories; installing the auxiliary
shelf; connecting the power and other cables; installing the primary system
manager terminal (SMT); setting the configuration switches; and checking
the entire installation. Figure 3-1 shows the major installation tasks
described in this chapter.
RECEIVE, INSPECT,
AND UNCRATE THE
XC1000 EQUIPMENT.
PLACE THE CABINET
IN POSITION.
CONNECT –48-VDC
POWER AND
GROUND.
CONNECT CO SWITCH
CONNECTORS TO
BACKPLANE.
CONNECT ALARMS,
DATA LINKS, AND X.25
TO MAIN DISTRIBUTION
PANEL.
CONNECT INTEGRATION
DATA LINKS AND MTA TO
ACP I/O DISTRIBUTION
BOARD.
CONNECT BUSY-
OUT CABLE AND
POWER.
INSTALL SMT AND
PRINTER.
VERIFY OR SET
CONFIGURATION
SWITCHES.
CHECK SYSTEM
WIRING.
INSTALLATION
COMPLETE.
PROCEED WITH
INITIAL STARTUP
PROCEDURE.
ENSURE EQUIPMENT
AND PERSONAL
SAFETY.
OBTAIN TOOLS.
Figure 3-1. Installation Procedures.
Before installing the XC1000, the site must be prepared as described in
Chapter Two,
Site Preparation
. All power, telephone, and data-link cabling
must be installed and properly terminated for connection to the XC1000.
3.2 ENSURING EQUIPMENT AND PERSONNEL SAFETY
Preventing injury and safeguarding the equipment must be primary con-
siderations during the XC1000 installation. Safety issues include electrical,
equipment-handling, and environmental safety.
Follow the installation procedures in this chapter to prevent equipment
damage and personal injury. Safety hazards arise from the weight and bulk
of the XC1000 and the electrical connections that must be made.
Содержание XC1000
Страница 1: ...EDITION ONE XC1000 P N 101 1345 000 SERVICE MANUAL ...
Страница 8: ...CONTENTS ...
Страница 19: ...1 INTRODUCTION ...
Страница 30: ...2 SITE PREPARATION ...
Страница 60: ...3 PLATFORM INSTALLATION ...
Страница 112: ...4 STARTUP AND INITIALIZATION ...
Страница 177: ...5 ROUTINE MAINTENANCE ...
Страница 195: ...6 TROUBLESHOOTING ...
Страница 237: ...7 STATUS LOG ...
Страница 297: ...STATUS LOG 7 54 Edition One XC1000 Service ...
Страница 302: ...8 REPAIR AND REPLACEMENT ...
Страница 380: ...9 SYSTEM UTILITIES ...
Страница 424: ...10 COMPONENT DESCRIPTIONS ...
Страница 465: ...11 OPTIONAL FEATURES ...
Страница 485: ...12 RELEASE 1 55 UPGRADE INSTRUCTIONS ...
Страница 516: ...13 RELEASE 2 X UPGRADE INSTRUCTIONS ...
Страница 559: ...14 RELEASE 3 02 FCP CONVERSION INSTRUCTIONS ...
Страница 603: ...15 RELEASE 3 02 ONLINE UPGRADE INSTRUCTIONS ...
Страница 631: ...16 RELEASE 3 0 SYSTEM UTILITIES ...
Страница 683: ...17 RELEASE 4 X FCP CONVERSION INSTRUCTIONS r P N 281 0023 002 1 of 3 ...
Страница 725: ...18 RELEASE 4 X ONLINE UPGRADE INSTRUCTIONS r P N 281 0023 002 2 of 3 ...
Страница 760: ...19 RELEASE 4 0 SYSTEM UTILITIES P N 281 0023 002 Part 3 of 3 r ...
Страница 776: ...20 RELEASE 4 1 SYSTEM UTILITIES P N 281 0033 000 ...
Страница 787: ...APPENDIXES ...