![Octel XC1000 Скачать руководство пользователя страница 721](http://html.mh-extra.com/html/octel/xc1000/xc1000_service-manual_723818721.webp)
RELEASE 4.X FCP CONVERSION INSTRUCTIONS
17-35
Release 4.X
XC1000 Service
If any stage in the conversion fails, attempt to continue by selecting the
Perform/Continue Conversion
option from the FCP conversion Main Menu.
A message containing the number of the stage that failed and a prompt
asking whether to continue appears. Always respond to the prompt by
typing
y
to continue. Do not type
n
to stop the conversion.
The XC1000 attempts to restart the conversion. If the conversion cannot be
restarted, refer to the information provided in this section about the stage
of the conversion. In some cases, a description about the actions the
system performs during the stage is given. This information might help to
identify and correct the problem. In other cases, possible causes of and
solutions for the situation are given.
The stages are as follows:
Stage 10.
The FCP conversion program prepares for the upgrade by
accessing the XC1000 SMT. The program prompts you to download
the port configuration. Then the program retrieves the XC1000
configuration to determine whether the upgrade can be performed.
The program prompts you to disable the ports in menu 4 and to run
validity checks and garbage collect.
Stage 11.
The FCP conversion program shuts down the XC1000 and
accesses the offline utilities. The program verifies that the engineering
option is enabled.
The program prompts you to perform a phrase verification and to
create a backup drive. If CB messages are logged during the phrase
verification, call the Octel TAC.
Stage 19.
The FCP conversion program modifies a software record so
that the XC1000 can download the special IPL software.
Stage 20.
The FCP conversion program records the menu 6.3
configuration and assigns one flex port (physical port 1) as the
download port. Then the program sets the port to 19200 baud.
Stage 21.
The FCP conversion program automatically downloads
the termcap file to check whether the download port is set up and
connected correctly. If the port is set up and connected incorrectly, a
message indicating the failure appears. Check the connections between
the PC and the XC1000 as follows:
a. Disconnect the cable from the SMT port (J50).
b. Disconnect the cable from the J43 port and plug it into the SMT
port.
c.
From the FCP conversion Main Menu, select option
3. SMT
Emulation
.
d. In the
Com Port:
field, press the space bar to toggle the
selection to COM 2.
e.
Press
End
to connect the PC to the XC1000.
f.
From the FCP conversion Main Menu, select the
SMT Emulation
option. If the
ENTER BOOT COMMAND:
prompt appears, the PC
COM 2 port and cable are functioning correctly.
SECTION 17.12
Содержание XC1000
Страница 1: ...EDITION ONE XC1000 P N 101 1345 000 SERVICE MANUAL ...
Страница 8: ...CONTENTS ...
Страница 19: ...1 INTRODUCTION ...
Страница 30: ...2 SITE PREPARATION ...
Страница 60: ...3 PLATFORM INSTALLATION ...
Страница 112: ...4 STARTUP AND INITIALIZATION ...
Страница 177: ...5 ROUTINE MAINTENANCE ...
Страница 195: ...6 TROUBLESHOOTING ...
Страница 237: ...7 STATUS LOG ...
Страница 297: ...STATUS LOG 7 54 Edition One XC1000 Service ...
Страница 302: ...8 REPAIR AND REPLACEMENT ...
Страница 380: ...9 SYSTEM UTILITIES ...
Страница 424: ...10 COMPONENT DESCRIPTIONS ...
Страница 465: ...11 OPTIONAL FEATURES ...
Страница 485: ...12 RELEASE 1 55 UPGRADE INSTRUCTIONS ...
Страница 516: ...13 RELEASE 2 X UPGRADE INSTRUCTIONS ...
Страница 559: ...14 RELEASE 3 02 FCP CONVERSION INSTRUCTIONS ...
Страница 603: ...15 RELEASE 3 02 ONLINE UPGRADE INSTRUCTIONS ...
Страница 631: ...16 RELEASE 3 0 SYSTEM UTILITIES ...
Страница 683: ...17 RELEASE 4 X FCP CONVERSION INSTRUCTIONS r P N 281 0023 002 1 of 3 ...
Страница 725: ...18 RELEASE 4 X ONLINE UPGRADE INSTRUCTIONS r P N 281 0023 002 2 of 3 ...
Страница 760: ...19 RELEASE 4 0 SYSTEM UTILITIES P N 281 0023 002 Part 3 of 3 r ...
Страница 776: ...20 RELEASE 4 1 SYSTEM UTILITIES P N 281 0033 000 ...
Страница 787: ...APPENDIXES ...