![Octel XC1000 Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/octel/xc1000/xc1000_service-manual_723818034.webp)
2
2-1
Edition One
XC1000 Service
SITE PREPARATION
2.1 OVERVIEW
Before installing a XC1000, the site where the XC1000 will be located must be
prepared to meet specific requirements. This chapter contains instructions for
preparing the site, including information about equipment location; cabling
and connector requirements; and procedures for installing external power, data
links, telephone wiring, and floor mounts. The sections about cabling assist in
determining cable lengths and connector locations. These procedures should
be accomplished before delivery of the XC1000.
The customer must supply the –48 Vdc power for the XC1000 –48 Vdc input-
power requirement.
Before preparing the site for installing the XC1000, refer to Chapter Ten for
descriptions of the XC1000 components. Determine the environmental and
power needs for XC1000 and observe all distance and length limitations
specified in this chapter. Use shielded cable for all telephone wiring and data
connections to external hardware. The customer is responsible for all equip-
ment not supplied by Octel and for meeting XC1000 site requirements.
Figure 2-1 shows the flow of the relevant site-preparation tasks discussed
this chapter. Appendix A provides a site-preparation checklist.
DETERMINE THE
CABINET LOCATION
AND
REQUIREMENTS.
INSTALL THE FLOOR
MOUNTS.
PROVIDE –48 VDC
POWER
AND GROUND
THE CHASSIS.
INSTALL THE
SWITCH CABLES.
INSTALL CABLES FOR
ALARM RELAYS AND
DATA LINKS.
INSTALL BUSY-OUT
CONNECTIONS (IF
REQUIRED).
SITE PREPARATION
COMPLETE.
PROCEED WITH
INSTALLATION.
Figure 2-1. Site-Preparation Task Flow.
The following tools and test equipment are required to perform the procedures
in this chapter. Tools and equipment required for specific procedures are
listed in the related sections.
-
Crimping tool (swage)
-
Wire cutter, diagonal
-
RS-232 breakout box
-
Screwdrivers, flat blade, small and medium, minimum 4
1
⁄
2
-inch shaft length
Содержание XC1000
Страница 1: ...EDITION ONE XC1000 P N 101 1345 000 SERVICE MANUAL ...
Страница 8: ...CONTENTS ...
Страница 19: ...1 INTRODUCTION ...
Страница 30: ...2 SITE PREPARATION ...
Страница 60: ...3 PLATFORM INSTALLATION ...
Страница 112: ...4 STARTUP AND INITIALIZATION ...
Страница 177: ...5 ROUTINE MAINTENANCE ...
Страница 195: ...6 TROUBLESHOOTING ...
Страница 237: ...7 STATUS LOG ...
Страница 297: ...STATUS LOG 7 54 Edition One XC1000 Service ...
Страница 302: ...8 REPAIR AND REPLACEMENT ...
Страница 380: ...9 SYSTEM UTILITIES ...
Страница 424: ...10 COMPONENT DESCRIPTIONS ...
Страница 465: ...11 OPTIONAL FEATURES ...
Страница 485: ...12 RELEASE 1 55 UPGRADE INSTRUCTIONS ...
Страница 516: ...13 RELEASE 2 X UPGRADE INSTRUCTIONS ...
Страница 559: ...14 RELEASE 3 02 FCP CONVERSION INSTRUCTIONS ...
Страница 603: ...15 RELEASE 3 02 ONLINE UPGRADE INSTRUCTIONS ...
Страница 631: ...16 RELEASE 3 0 SYSTEM UTILITIES ...
Страница 683: ...17 RELEASE 4 X FCP CONVERSION INSTRUCTIONS r P N 281 0023 002 1 of 3 ...
Страница 725: ...18 RELEASE 4 X ONLINE UPGRADE INSTRUCTIONS r P N 281 0023 002 2 of 3 ...
Страница 760: ...19 RELEASE 4 0 SYSTEM UTILITIES P N 281 0023 002 Part 3 of 3 r ...
Страница 776: ...20 RELEASE 4 1 SYSTEM UTILITIES P N 281 0033 000 ...
Страница 787: ...APPENDIXES ...