
106 of 202 Integrated Network Management Broadband Historical Overview
INM Broadband Release 4.1
PG OC 98-13
Issue 1.2
Figure 41 Example of PM threshold crossing
NM00022(R5)
Performance statistics can be queried for a single NE through the Performance
Statistics Query dialog, shown in Figure 42 on page 107 . The Performance
Statistics Query dialog is used to specify exactly which performance statistics
should be retrieved. This dialog provides a quick and effortless access to PM
data via a GUI, as opposed to accessing the same PM information on a MAPCI
screen from the individual NEs in a network.
Using the performance statistics dialog, users have the flexibility to retrieve all
PM counts from all CPGs and facilities or have a specific search criteria
consisting of a retrieval of a single CPG with a subset of applicable parameters.
An example would be to retrieve PM counts from the DS-3 G1 CPG and
obtaining only the Section CV, Line CV parameters in the Rx direction.
Similar types of search criteria can be applied to protection switching counts.
The Performance Statistics Display may be saved in a disk file, either for
export to third-party application or for report generation. All counts that were
retrieved are saved to the file.
NE1
NE2
1m+
3m+
Network Browser: OC48 Ring System
Help
File Fault Configuration Performance
Login Options
Controllers
48
48
48
48
NE3
NE4
3m+
1m+
Details of Selected Alarm
Reason : Rx Loss of Signal
Location : Frame 101 Bottom
Shelf Position : 2
Unit : OC48 G1
Done Alt+Return
List Options
This dialog shows the requested alarms for the Network Elements specified
Update List
Reset List
Network Element Alarm Class Unit Reason Time Severity
2 NE2 45 Fac OC-48 G1 Rx Loss of Signal 28 Jul'95 06:30:45 m, nsa
Replace list with requested alarms
Add requested alarms to list
Display Options:
Major
Showing:
Auto
Ctitical
Minor
Warnings
2 NE2 47 Fac OC-48 G1 Protection sw complete 28 Jul'95 06:30:45 w, nsa
2 NE2 6 Fac DS3 G1 1 Path Rx UAS threshold 28 Jul'95 06:30:45 w, nsa
Threshold crossings
Threshold Crossing
Indicator
Threshold crossing alarm
Содержание INM 4.1
Страница 2: ......
Страница 8: ...viii of 202 Table of Contents INM Broadband Release 4 1 PG OC 98 13 Issue 1 2...
Страница 26: ...26 of 202 About this document Integrated Network Management Broadband Release 4 1 PG OC 98 13 Issue 1 2...
Страница 100: ...100 of 202 INM 4 1 New Feature Description INM Broadband Release 4 1 PG OC 98 13 Issue 1 2...
Страница 182: ...182 of 202 TCP IP Network Requirements INM Broadband Release 4 1 PG OC 98 13 Issue 1 2...
Страница 198: ...198 of 202 List of Terms INM Broadband Release 4 1 PG OC 98 13 Issue 1 2...
Страница 201: ......