61
7 Startup
7.1
Initial startup
WARNING!
Prior to startup, ensure that the device has been installed and connected prop-
erly and
in compliance with the installation instructions. Observe the safety instructions
in this description.
v
Chapter 1 "Safety information", Page 13
CAUTION!
A backup battery is built into the device. Its purpose is to maintain data when
the device is switched off or if the voltage supply is interrupted. If the battery
approaches the end of its operating life (approximately 7 years) then a battery
prealarm will indicate that status. When the battery is empty a battery alarm will
indicate that status. The battery must be exchanged before it is empty. The bat-
tery must be exchanged by the JUMO Service department! In this case, send
in the device!
CAUTION!
The touchscreen must not be operated with sharp or pointed objects, as these
could damage the protective film and the touchscreen.
Step
Action
1
Switch on the voltage supply to the device and wait until it has boot-
ed up.
2
Select the operating language.
3
Log in as user "Master" or "Service" in order to have access to the
configuration in the device menu.
v
Chapter 8.2.1 "Log-on/Log-out", Page 78
4
Set the date and time.
v
Chapter 9.1 "Date and time", Page 109
5
Make the basic settings for the device.
v
Chapter 10.2 "Basic settings", Page 116
6
Configure the analog and binary inputs you wish to use.
v
Chapter 10.5 "Analog inputs", Page 121
v
Chapter 10.7 "Digital inputs of base unit and optional boards",
7
Check the hardware functions of the device.
v
Chapter 7.2 "Function test", Page 62
8
Calibrate any analysis sensors connected to the device.
v
Chapter 12 "Calibration in general", Page 169
9
The device is now ready for use. You can configure the displays
and functions of the device according to your needs.
Содержание AQUIS touch P 202580
Страница 12: ...Content...
Страница 26: ...4 Identifying the device version 26...
Страница 29: ...29 5 Mounting Mounting depth with Ci conductivity sensor 283 3 mm 2 3 mm 36 mm 25 mm 23 2 mm...
Страница 32: ...5 Mounting 32...
Страница 64: ...7 Startup 64...
Страница 100: ...1 2 3 4 5...
Страница 107: ...107 8 Operation Example of a Quad View...
Страница 108: ...8 Operation 108...
Страница 114: ...9 Parameterization 114...
Страница 160: ...10 Configuration 160...
Страница 182: ...13 Calibrating a pH measuring chain 182...
Страница 196: ...16 Calibrating CR conductivity sensors 196...
Страница 206: ...17 Calibrating Ci conductivity sensors 206...
Страница 214: ...18 Calibrating universal inputs 214...
Страница 228: ...19 PC Setup Program 228...
Страница 319: ...319 20 Technical data...
Страница 320: ...20 Technical data 320...
Страница 321: ......