6 Electrical connection
6.1
Installation notes
Qualification of personnel
•
The electrical connection must only be carried out by qualified personnel.
Electrical wiring
•
When selecting the electrical wiring material as well as when installing and
connecting the device electrically, comply with the requirements of DIN VDE
0100 "Low-voltage electrical installations" and the applicable country-specif-
ic regulations (e. g. based on IEC 60364).
•
The input, output, and power supply lines must be separated from one an-
other spatially and not laid in parallel.
•
Select suitable cables for sensors and interfaces (shielded and twisted or co-
axial cable). These lines must not be installed near live electrical compo-
nents or current-carrying wiring.
•
Sensor lines must be uninterrupted (not connected via terminal blocks or the
like).
•
Provide shielding in accordance with the connection diagram on the device.
•
In a star wiring configuration, grounding wires must be connected to an equi-
potential grounding busbar and insulation must be intact. Keep lines as short
as possible. Ensure proper potential equalization/bonding.
Electrical safety
•
Disconnect all phases of the power supplied to the device (power grid, out-
side power supply sources for relays/solid state relays etc.) If current-carry-
ing components could be touched while work is being performed.
•
Fuses for power supply circuits should be rated at no more than 10 A (slow-
blow).
•
To prevent destruction of device outputs in the event of an external short cir-
cuit, short-circuit currents in circuits with relay or semiconductor outputs
should be limited through use of appropriate fuses.
•
The device is not suitable for installation in potentially explosive atmo-
spheres.
•
Besides incorrect installation, wrong settings on the device can adversely af-
fect performance of the connected process. For this reason, independently
operating safety devices, e.g. pressure relief valves, temperature limiters/
monitors, liquid-metering limiters and overflow prevention devices should be
provided and adjustment of them restricted only to train technical personnel.
Appropriate safety regulations must be observed in this connection.
•
Plug-in screw terminal strips should not be unplugged until after the power
has been disconnected.
References to other information
DANGER!
Observe the following instructions!
Содержание AQUIS touch P 202580
Страница 12: ...Content...
Страница 26: ...4 Identifying the device version 26...
Страница 29: ...29 5 Mounting Mounting depth with Ci conductivity sensor 283 3 mm 2 3 mm 36 mm 25 mm 23 2 mm...
Страница 32: ...5 Mounting 32...
Страница 64: ...7 Startup 64...
Страница 100: ...1 2 3 4 5...
Страница 107: ...107 8 Operation Example of a Quad View...
Страница 108: ...8 Operation 108...
Страница 114: ...9 Parameterization 114...
Страница 160: ...10 Configuration 160...
Страница 182: ...13 Calibrating a pH measuring chain 182...
Страница 196: ...16 Calibrating CR conductivity sensors 196...
Страница 206: ...17 Calibrating Ci conductivity sensors 206...
Страница 214: ...18 Calibrating universal inputs 214...
Страница 228: ...19 PC Setup Program 228...
Страница 319: ...319 20 Technical data...
Страница 320: ...20 Technical data 320...
Страница 321: ......