Context
The method of connecting the PDU8000 to the ECC800-Pro is the same as that for
the integrated PDU. Connecting the integrated PDU to the ECC800-Pro by
following the instructions in this section.
Procedure
Step 1 Set the PDU8000 monitoring parameters.
1. Enter the PDU8000 home screen, tap System Info.
2. Choose System Info > Settings, enter the user name admin and password
000001, and tap
.
3. Tap Communication to set IP address assign to Automatic(DHCP) on the
displayed communication settings screen and the PDU8000 is discovered by
ECC800-Pro automatically and is connected to the ECC800-Pro.
NO TE
– On the Communication screen, set SSL to Enable.
– If the PDU is a modular precision PDU, set modbusTCPcertification to Disable on
the Communication screen.
----End
8.1.7.7 How Can I Set and Add a Transformer (Modbus-RTU)?
Prerequisites
One end of the RS485 cable has been connected to ports 19 and 20 on the
transformer temperature controller, and the other end has been connected to the
COM port on the ECC800-Pro.
Procedure
Step 1 Set the communications address for the transformer LCD.
Procedure
Button
Display
Description
Range
1
SET
Enter the
function
operation
state.
/
2
SET
/
/
3
Communicati
ons address
setting
password
/
4
SET
Communicati
ons address
/
ECC800 Data Center Controller
User Manual (for ECC800-Pro)
8 FAQ
Issue 02 (2020-09-07)
Copyright © Huawei Technologies Co., Ltd.
268