6135A/PMU
Operators Manual
5-4
Run an Automated Test
To run an automated test:
1.
Use the instructions in Chapter 4 to prepare the UUT for test and calibration.
2.
Click
Test
in the top
Navigation Menu
.
3.
In
General Interactive Testing
, click
Run Automated Test
. A Windows Load
dialog box opens (see Figure 5-1).
gtu106.jpg
Figure 5-1. Load Automated Test
4.
Select an automated test to run then select
OK
(refer to “Automated Test List Files”
in Chapter 4 for test file information). After
OK
is selected, the result file selection
window opens.
5.
Make a selection on how to save the automated test results (see Figure 5-2). After a
selection is made, the test status window opens and the automated test immediately
starts.
Note
If you select “Continue Using” or “Browse to an Existing…”the results
from the automated test will overwrite the results in the file.
Содержание 6135A/PMU
Страница 28: ...6135A PMU Operators Manual 2 2...
Страница 44: ...6135A PMU Operators Manual 3 2...
Страница 70: ...6135A PMU Operators Manual 3 28...
Страница 72: ...6135A PMU Operators Manual 4 2...
Страница 92: ...6135A PMU Operators Manual 4 22 gtu135 jpg Figure 4 12 Problem All Outputs Forced Off...
Страница 94: ...6135A PMU Operators Manual 5 2...
Страница 102: ...6135A PMU Operators Manual 5 10...
Страница 104: ...6135A PMU Operators Manual 6 2...
Страница 120: ...6135A PMU Operators Manual 7 2...
Страница 138: ...6135A PMU Operators Manual 7 20 gtu120 emf Figure 7 18 Example Report...
Страница 140: ...6135A PMU Operators Manual 8 2...
Страница 150: ...6135A PMU Operators Manual 9 2...
Страница 160: ...6135A PMU Operators Manual A 4...