4-20
Cisco Catalyst Switch Manager User Guide
OL-4930-01
Chapter 4 Deploying the Cisco Catalyst Switch Manager
Predeploying Anticipated Network Objects
Note
When predeploying Content Switch Modules, this value cannot be greater than 1 for IOS
12.1(8a)E3 and earlier and no greater than 11 for IOS 12.1(8a)EX and later.
Note
When predeploying Port Adapter subchassis objects using the corresponding deployment
template, this value cannot be greater than 2. If it is, an error message will be displayed and the
Forward button will not work.
The Deployment Wizard—Object Parameters (2) window appears for each module to be predeploy
according the entry provided in
Step 2
. Depending on the deployment template launched in
Step 1
, the
fields on the Deployment Wizard—Object Parameters window (2) vary.
Step 3
Provide data in the displayed Object Parameter fields as applicable per the following descriptions.
•
Name—Name given to the module
•
Type—Type of module or port adapter to be predeployed. Depending on the deployment template
launched in
Step 1
, options are as follows:
•
Chassis Slot Number—The slot in which the subchassis module is to be predeployed. This field is
not available on the Port Adapter submodule deployment template.
Note
If you enter a chassis slot number that is already occupied, an error message displays and the
Forward button will not work.
•
FlexWan Bay Number—The FlexWAN bay in which the port adapter is to be deployed. The port
adapter can be deployed in bays 0 and/or 1. This field is not available on the Supervisor/Control,
Ethernet, or OSM module deployment templates.
Note
Valid FlexWAN bay numbers are 0 or 1. If you enter any other number, an error message displays
and the Forward button will not work.
Step 4
Click Forward.
The Deployment Wizard—Summary window displays.
Step 5
Click Finish to predeploy the module and close the Deployment Wizard—Summary window if the
predeployment summary information is correct. If the Deployment Wizard—Summary information is
incorrect, click Cancel to stop predeployment and close the Deployment Wizard—Summary window.
The Deployment Wizard—Summary window closes and the deployed Module or Port Adapter object(s)
appear in the left-hand pane of the Map Viewer beneath the chassis or FlexWAN object from which
deployment was initiated and the corresponding icon(s) appear in the right-hand pane of the Map Viewer.
The objects predeploy in an unmanaged state (e.g., decommissioned).
Once the predeployed Network Element, of which the predeployed Module or Port Adapter is part of, is
available on the network the chassis object automatically commissions and initiates subchassis
discovery. Subchassis objects appear within the Map Viewer beneath the appropriate object and appear
in the Chassis Map.
Содержание WS-C3550-12G
Страница 20: ...Contents xx Cisco Catalyst Switch Manager User Guide OL 4930 01 ...
Страница 388: ...11 36 Cisco Catalyst Switch Manager User Guide OL 4930 01 Chapter 11 Routing Management IS IS Management Window ...
Страница 398: ...12 10 Cisco Catalyst Switch Manager User Guide OL 4930 01 Chapter 12 Profile Management Syslog Profile ...
Страница 436: ...A 2 Cisco Catalyst Switch Manager User Guide OL 4930 01 Appendix A Modifying ini Files ...