3. OPERATION AND TIMING
COPYRIGHT © 2001 CANON INC. CANON CLC1000/1000S/3100 REV.2 MAY 2001 PRINTED IN JAPAN (IMPRIME AU JAPON)
3-26
D. Sequence of Basic Operations
1. Sequence at Power-On
Figure 3-126
• When the fixing temperature reaches 110°C after power-on, the photosensitive drum starts to rotate, and
initial potential control will start when the potential on the drum has become stable (when the drum has
made a 1/2 rotation).
When the fixing temperature reaches 110°C, a transfer belt home position search is executed, at the end
of which image position correction will start.
• The fixing temperature means the surface temperature of the fixing roller (reading of the thermistor
indicated under ‘ANALOG’ of ‘DISPLAY’ in service mode).
WMUP
STBY
I NTR
180ºC
110ºC
Initial potential control
Temperature control
Transfer belt HP search
Image correction
Scanner HP search
Fixing heater (upper/lower)
Transfer belt motor
Transfer charging current
Laser activation
Photosensitive drum motor
Grid bias
Primary charging bias
Developing motor
Developing bias
Original scanner motor
Power switch ON
Содержание Vizcam 1000
Страница 12: ......
Страница 30: ......
Страница 44: ......
Страница 86: ......
Страница 254: ......
Страница 372: ......
Страница 374: ......
Страница 418: ......
Страница 438: ......
Страница 442: ......
Страница 754: ......
Страница 764: ......
Страница 766: ......
Страница 840: ...0501GR PRINTED IN JAPAN IMPRIME AU JAPON This publication is printed on 100 reprocessed paper...