Task Table
Issue 7 November 2003
2-7
555-233-115
Install the UN332C and Optical Drive
Optical Drive: Unlock DUPINT Switches (High/Critical reliability only)
Optical Drive: Wait for System to Refresh (High/Critical reliability only)
Save Translations to Removable Media
Save Announcements (if necessary) to Removable Media
Phase 2 Hardware Addition/Replacement
Verify Active Tone-Clock is on SPE B (High/Critical reliability only)
Lock to SPE B (High/Critical reliability only)
Add Memory, Replace DUPINT Circuit Pack, and Unseat Disk Drive on
SPE A
Unlock DUPINT Switches (High/Critical reliability only)
Wait for System Handshake (High/Critical reliability only)
Set Tone-Clock in SPE A to Active (High/Critical reliability only)
Lock Switches to SPE A (High/Critical reliability only—affects service)
Power Down SPE B (High/Critical reliability only)
Power Up SPE B (High/Critical reliability only)
Unlock DUPINT Switches (High/Critical reliability only)
Wait for System Refresh (High/Critical reliability only)
Administer No-License/Emergency Numbers
Set Daylight Savings Rules (if necessary)
Table 2-2.
Tasks list: G3V4 through R8r to Avaya Communication Manager (Continued)
3
Task Description
Page
Continued on next page