Task Tables
Issue 7 November 2003
5-11
555-233-115
High Reliability
Reconnect Cables to Upgraded EPN Cabinet
Enable Alarm Origination to INADS
Register the Switch for Maintenance
Table 5-4.
Tasks to Upgrade to High Reliability
3
Task Description
Page
Follow Routine Preventive Maintenance
Install Power-Failure Transfer Ground Wire
Remove Circuit Packs from Module Control Carrier A
Remove CURL from Module Control Carrier A
Remove Module Control Carrier A
Continued on next page
Table 5-3.
Tasks to Upgrade Standard Reliability (Continued)
3
Task Description
Page
Continued on next page