Adding New Carriers and EPN Cabinets
555-233-115
6-82
Issue 7 November 2003
Figure 6-40.
Switch-Connected with SNC in EPN
Switch-Connect New EPN to Existing PPN and
EPN (High Reliability)
For the following connection example, the PPN cabinet is called Cabinet 1, the
first EPN cabinet is called Cabinet 2, and the EPN cabinet containing the Switch
Node Carrier is called Cabinet 4.
NOTE:
For the following example, add links to PNs in alternating order, for example:
20 and 2, 19 and 3, 18 and 4, and so forth.
Figure Notes
1. Cabinet 1 (PPN)
2. Cabinet 4 (MCC EPN with One Switch
Node)
3. Cabinets 2, 3, and 5
through 16 (MCC or SCC
EPNs)