Complete the Upgrade
Issue 7 November 2003
5-83
555-233-115
Complete the Upgrade
Verify Usable Circuit Pack Vintages
Verify that each circuit pack reused in the upgrade conforms to the usable vintage
requirements (see Reference Guide for Circuit Pack Vintages and Change
Notices).
Remove Power-Failure Ground Strap
Remove the ground strap from the power-failure transfer unit.
Boot the System
1. Connect the management terminal to the “TERMINAL” connector behind
PPN control carrier “A,” or install the G3-MA according to the “Set Up
G3-MA” chapter of DEFINITY Communications System Generic 3
Management Applications
—
Operations, 585-229-202.
2. Insert the translation cards in the TN794 faceplates.
3. At each EPN power distribution unit, set the main circuit breaker to ON.
4. At the PPN power distribution unit, set the main circuit breaker to ON.
5. The system performs the reset level 4 rebooting process, loading the
default system translations from the translation cards. This takes 8 to 11
minutes.
6. Get the order number of the upgrade and call the regional CSA to request
an “init” login so the right-to-use options can be enabled.
7. To use Access Security Gateway (ASG), see
Install the License File
New, duplicated G3r systems only
1. Retrieve the RFA License File with both serial numbers from the RFA
Application.
2. Type set time and press
Enter
.
Ensure that the system date and time are set correctly.
3. Use one of these installation methods:
■
‘‘Installation (direct connection)’’
■