Install the EPN
Issue 7 November 2003
4-21
555-233-115
3. Install the port circuit packs into the A cabinet using the label on the front of
the carrier and the annotated list of circuit packs as a guide.
NOTE:
Because the new expansion control carrier has 6 more port slots than
the one removed, you do not need to retranslate these circuit packs.
4. For an EPN in a high or critical reliability system, install a TN2182B
Tone-Clock and a TN570 EI in slots 1 and 2 of port cabinet B. See
.
’
Change Cabinet Address Plugs
If a duplicated control cabinet was removed from position B and was not replaced
with a new port cabinet, the upgraded EPN’s port cabinets occupy different
positions in the cabinet stack.
1. Behind each port cabinet, find the address plug attached to 2 of the 6
backplane pins to the right of the pin-field block for slot 00.
2. Change the location of each port cabinet address plug to reflect the
cabinet’s current position. See
.
Table 4-5.
TN570 Expansion Interface Requirements
Cabinet
2 PNs w/o Critical
Reliability
2 PNs w/Critical
Reliability
3 PNs w/o Critical
Reliability
3 PNs w/Critical
Reliability
PPN
1
2
2
4
EPN 1
1
2
2
4
EPN 2
N/A
N/A
2
4