Task Tables
Issue 7 November 2003
5-13
555-233-115
Critical Reliability
Table 5-5.
Tasks to Upgrade to Critical Reliability
3
Task Description
Page
Follow Routine Preventive Maintenance
Install Power-Failure Transfer Ground Wire
Remove Circuit Packs from Module Control Carriers A and B
Remove CURL from Module Control Carrier A
Remove Module Control Carriers A and B
Prepare the New A and B Position Carriers
Install the New A and B Position Carriers
Verify Usable Circuit Pack Vintages
Remove Power-Failure Ground Strap
Administer No-License/Emergency Numbers
Close Upgraded EPN Cabinet and Reconnect Cables
Continued on next page