Dismantle SCC PPN
Issue 7 November 2003
4-15
555-233-115
Dismantle SCC PPN
Check SPE
1. Type status system 1 and press
Enter
to check the health of the SPE.
Disable Scheduled Maintenance and Alarm
Origination to INADS
1. To prevent scheduled daily maintenance from interfering with the update or
upgrade, type change system-parameters maintenance and press
Enter
.
2. If scheduled maintenance has begun, set the
Stop Time
field to 1 minute
after the current time.
or
If scheduled maintenance has not begun, set the
Start Time
field to a
time after the upgrade is completed. For example, if you start the upgrade
at 8:00 p.m. and the upgrade takes 90 minutes, set the
Start Time
field
to 21:30.
!
CAUTION:
If you do not disable Alarm Origination, the system may generate
alarms, resulting in unnecessary trouble tickets.
3. Type neither in the
Alarm Origination to OSS Numbers
field and
press
Enter.
NOTE:
For some software loads, set the
Alarm Origination
Activated
field to n and set the
Cleared Alarm Notification
and
Restart Notification
fields to disable or n before pressing
Enter
.