Upgrading a Multicarrier G2 Universal Module to Avaya
DEFINITY Server R EPN running Avaya Communication
Manager
555-233-115
5-116
Issue 7 November 2003
7. Behind port carrier B of EPN cabinet 2:
■
Install a lightwave transceiver on cable connector at slot 2B03.
■
Connect 1 end of the fiber optic cable to the lightwave transceiver,
just installed, at slot 2B03.
■
Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
8. Behind port carrier B of EPN cabinet 3:
■
Install a lightwave transceiver on cable connector at slot 3B03.
■
Connect the other end of the fiber optic cable to the lightwave
transceiver, just installed, at slot 3B03.
■
Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
■
At the top of the cabinet, coil the surplus fiber optic cable, and
carefully attach the coil to the wall of the cable tray.
Figure 5-28.
Critical Reliability with 2 or 3 Port Networks
Figure Notes
1. Cabinet 1 PPN
2. Cabinet 2 EPN 1
3. Cabinet 3 EPN 2