Remove an EPN Cabinet from an Existing System
Issue 7 November 2003
6-89
555-233-115
4. Scroll to screen 2.
a. Type no, as applicable, in each
Facility Installed?
field (A,
B, C, and D).
b. The
Bit Rate:
field must remain administered if other fiber
connections associated with the facility will remain.
c. The idle code in the
Idle Code MSB (1) . . . . LSB (8):
field must remain administered.
d. The
Line Coding:
field must remain administered.
5. For a T1 site, proceed to
. For an E1 site, proceed to
.
T1 Installations Only
1. The
Framing Mode:
field is display only.
2. The
DS1CONV-1 Line Compensation:
and the
DS1CONV-2 Line
Compensation:
fields are display only.
3. Remove the
Facility Circuit ID:
from the facilities being
unadministered, if used. Press
Enter
.
4. A display similar to the following appears after the procedure is completed:
RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
.
E1 Installations Only
1. The
CRC?
field must remain administered.
2. The
Line Termination:
field is display only.
3. Remove the
Facility Circuit ID
information from the facilities being
unadministered, if used. Press
Enter
.
4. A display similar to the following appears after the procedure is completed:
RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
.
All Installations
1. When the system reset is finished, type status port-network 2 and press
Enter
. The Port Network Status screen appears. Verify that PNC Active is
“up” and that the Service State is “in.”
2. A Span LED, on the front of the DS1 Converter circuit pack, must be off for
each inactive facility administered. For example, if Facility A and Facility B
are unadministered, then the top 2 Span LEDs on the circuit pack must be
off. If the yellow LEDs are on, then problems were encountered during the
unadministration of hardware. Span LEDs associated with administered
facilities (C and D, in this example) should be on.