Upgrading R5si/R6si to an Avaya DEFINITY Server R
EPN running Avaya Communication Manager
555-233-115
4-62
Issue 7 November 2003
Figure 4-18.
Fiber Optic Connections Through Center Stage Switch
Figure Notes
1. Cabinet 1 with 1 Duplex Switch
Node
2. Cabinet Stack 2-16 EPN
3. H600-278 Metallic Cable
4. Add Links to EPNs in Alternating Order
(20, 3, 19, 4, 18, 5, and so forth)
5. Add Links to EPNs in Alternating Order
(20, 3, 19, 4, 18, 5, and so forth)
6. To additional EPNs