Install Expansion Control Carrier(s)
Issue 7 November 2003
5-75
555-233-115
Figure 5-11.
Location of P1 and P2 Connectors
Install Expansion Control Carrier(s)
Prepare the New A and B Position Carriers
1. Inspect the new carriers for any damage. Verify that the backplane pins are
not bent.
2. Place the expansion control carrier on the floor so that the rear of the
carrier faces up.
3. Install the CFY1 current limiter (CURL) on the “A” carrier to the pin-field
block marked “CURL.” The CURL is inserted with the components on the
left side as viewed from the rear.
4. At the rear connector panel, determine which connectors will have a cable
attached, and install a 4B cable retainer on each of these connectors.
Figure Notes
1. Rear of Control Carrier
2. P2 Connector
3. P1 Connector