Recommendation:
Place the mounting rail bracket 63 in. (1.6 m) from the floor,
which places screen center height at approximately 63 in. (1.6 m) from the floor.
CAUTION
This drawing shows the physical relationships of
the mounting brackets to each other and to the wall system
after
you complete the mounting instructions. Do not place
the wall system on the wall until you have completed all
preliminary steps.
2. Affix the mounting rail bracket to three studs at the selected height using the
available screws (anchors are provided for additional support).
CAUTION
Ensure that the upper "lip" of the bracket sticks
out from the wall and that the bracket is level.
3. Route the power cord through the channel in the back of the accessory bin bracket,
then mount the bracket on the center stud at least 13 in. (33 cm) below the
mounting rail bracket.
Directions for use
Setup 45
Summary of Contents for Connex IWS
Page 1: ...Welch Allyn Connex Devices Directions for use Software version 2 3X...
Page 10: ...4 Introduction Welch Allyn Connex Devices...
Page 14: ...8 Symbols Welch Allyn Connex Devices...
Page 20: ...14 Screen elements Welch Allyn Connex Devices...
Page 28: ...22 About warnings and cautions Welch Allyn Connex Devices...
Page 72: ...66 Navigation Welch Allyn Connex Devices...
Page 96: ...90 Profiles Welch Allyn Connex Devices...
Page 106: ...100 Patient data management Welch Allyn Connex Devices...
Page 120: ...114 Alarms Welch Allyn Connex Devices...
Page 184: ...178 Patient monitoring Welch Allyn Connex Devices...
Page 212: ...206 Advanced settings Welch Allyn Connex Devices...
Page 244: ...238 Specifications Welch Allyn Connex Devices...
Page 250: ...244 Standards and compliance Welch Allyn Connex Devices...
Page 252: ...246 Guidance and manufacturer s declaration Welch Allyn Connex Devices...
Page 266: ......