APS Timing Setup
APS Test Procedure:
The test set should be connected to a tributary port of network element or transmission system to ensure that the
switching time is measured for the service transported by the SONET network.
Ensure that no errors or alarms are present on the transmission system because this will impact the
measurement.
The measurement will be triggered by an Alarm Indication Signal (AIS)
The test set measures how long the AIS event remains present after the event is first recognized and will
continue to measure the total disruption time in the event of multiple disruptions.
10.2.7.2 APS Sequence
RXT-6200_RXT6000e_Module_Manual
Page 172 of 387
Summary of Contents for RXT-6000e
Page 1: ......
Page 39: ...Rx Pattern Setup Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 39 of 387...
Page 48: ...Tx Interface Setup Tx Structure Setup Text Mode RXT 6200_RXT6000e_Module_Manual Page 48 of 387...
Page 61: ...RXT 6200_RXT6000e_Module_Manual Page 61 of 387...
Page 97: ...RXT 6200_RXT6000e_Module_Manual Page 97 of 387...
Page 199: ...RXT 6200_RXT6000e_Module_Manual Page 199 of 387...
Page 267: ...Event Log Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 267 of 387...
Page 327: ...Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 327 of 387...
Page 351: ...Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 351 of 387...