G.873 > TU tab
Pointer Sequence Testing
It is recommended to run one sequence with positive adjustments followed by a
sequence with negative adjustments. Performing the measurement at the maximum
positive and negative frequency offset applicable to the line rate increases the stress on
the pointer processor.
The test procedure includes an initialization period followed by a cool down period of
30 seconds with no pointer movements.
10.1.5 Trace Identifier
Tap the
Trace
Identifier icon to display the path trace testing application and screens.
SDH/SONET Tools Menu
RXT-6200_RXT6000e_Module_Manual
Page 138 of 387
Summary of Contents for RXT-6000e
Page 1: ......
Page 39: ...Rx Pattern Setup Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 39 of 387...
Page 48: ...Tx Interface Setup Tx Structure Setup Text Mode RXT 6200_RXT6000e_Module_Manual Page 48 of 387...
Page 61: ...RXT 6200_RXT6000e_Module_Manual Page 61 of 387...
Page 97: ...RXT 6200_RXT6000e_Module_Manual Page 97 of 387...
Page 199: ...RXT 6200_RXT6000e_Module_Manual Page 199 of 387...
Page 267: ...Event Log Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 267 of 387...
Page 327: ...Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 327 of 387...
Page 351: ...Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 351 of 387...