Configuration Test
The
Config. Tests
tab lists the Pass/Fail status of each service and test. Tapping on the table brings up a screen with
CIR
,
CIR/EIR
and
Policing Test
results for the chosen Service.
CIR
,
CIR/EIR Test
, and
Policing
tabs display min,
mean, and max values for
IR Mbps
,
FTD
,
FDV
,
Frame Loss Count
, and
Frame Loss Ratio (%).
If Step Load was
selected for the CIR Test, these values will be displayed for each step. If any measured values do not meet the service
test parameters set in the Bandwidth and Threshold tabs, the test fails.
IR Mbps:
Information Rate. Measures the average Ethernet frame rate starting at the MAC address field and
ending at the CRC.
FTD:
Measures the time that the frames can take to travel from source to destination.
FDV:
Measures the frame jitter.
Frame Loss Count:
Counts the number of lost frames.
Frame Loss Ratio:
Ratio of lost frames to the total transmitted frames.
CIR Test - Service 1
CIR test
: The test passes if all measured values are below the thresholds configured. If a threshold is disabled, it will
not be evaluated towards pass/fail criteria.
CIR/EIR Test - Service 1
RXT-6200_RXT6000e_Module_Manual
Page 264 of 387
Summary of Contents for RXT-6000e
Page 1: ......
Page 39: ...Rx Pattern Setup Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 39 of 387...
Page 48: ...Tx Interface Setup Tx Structure Setup Text Mode RXT 6200_RXT6000e_Module_Manual Page 48 of 387...
Page 61: ...RXT 6200_RXT6000e_Module_Manual Page 61 of 387...
Page 97: ...RXT 6200_RXT6000e_Module_Manual Page 97 of 387...
Page 199: ...RXT 6200_RXT6000e_Module_Manual Page 199 of 387...
Page 267: ...Event Log Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 267 of 387...
Page 327: ...Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 327 of 387...
Page 351: ...Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 351 of 387...