10.2.9 Tributary Scan
This function requires VC12 or VT-1.5 mapping and allows you to quickly check the signal structure, trace identifier
and the payload.
Tributary Scan
An important part of any Add Drop Multiplexer (ADM) installation process is the verification of the path routing.
Considering that an STS-3 contains 84 x VT-1.5’s and a STS-12 contains 336 x VT-1.5’s checking each path
manually can be very time consuming.
The test set automatically performs a sequential BER test on each SONET tributary (VT channel) - mapping can be
via STS-N. The unit checks for any alarms in the received signal, the SONET structure, and for synchronization of the
selected test pattern in all channels. The result for each channel is entered in a table:
K.L.M.: ITU-T Tributary numbering scheme
Report: Pass (OK)
J2 trace: Corresponds to the VT trace being transmitted
Label: Corresponds to the V5 byte signal label being transmitted
RXT-6200_RXT6000e_Module_Manual
Page 174 of 387
Summary of Contents for RXT-6000e
Page 1: ......
Page 39: ...Rx Pattern Setup Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 39 of 387...
Page 48: ...Tx Interface Setup Tx Structure Setup Text Mode RXT 6200_RXT6000e_Module_Manual Page 48 of 387...
Page 61: ...RXT 6200_RXT6000e_Module_Manual Page 61 of 387...
Page 97: ...RXT 6200_RXT6000e_Module_Manual Page 97 of 387...
Page 199: ...RXT 6200_RXT6000e_Module_Manual Page 199 of 387...
Page 267: ...Event Log Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 267 of 387...
Page 327: ...Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 327 of 387...
Page 351: ...Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 351 of 387...