SWING FRAMES

Arch (3-1/2” and 5”), Tire, Bi-Pod, Tri-Pod (8’ and 10’ Height), Single 5” Post

PRE-INSTALLATION CHECK:

Compare all items received to the packing list. Notify your local sales representative immediately if any 

parts are missing or damaged. 

We are not responsible for items discovered missing or damaged

after 72 hours from time of delivery!

Before beginning installation, make sure that you have read and understand the Installation Introduction 

manual that was supplied to you. If you did not receive a copy, or if you have a question regarding anything 

covered in this manual, contact your local sales representative.

 

USER GROUP:

  

2 - 12

 

RECOMMENDED CREW:

  At least 

2 people

 

TOOLS REQUIRED:

 

 

1/4” allen head tool

  Level

  Tape 

measure

 

 

Auger / Post hole digger / Shovel

 

 

High speed 3/8” electric drill 

w/clutch

 

NOTE:

 

Use of any other driver may result in damage to tool and/or hardware!

 

INSTALLATION TIME:  

Varies

 

CONCRETE REQUIRED:

 

3.53 cubic feet per hole (arch frames)

     

5.29 cubic feet per hole (single post frames)

     

7 cubic feet per hole (bi-pod and tri-pod frames)

 

NOTE:  

Concrete must have a minimum rating of 2,500 psi and must be mixed per  

 

 

manufacturer’s recommendations.

NOTE:

  Swing chains and seats are sold separately.

Summary of Contents for Arch

Page 1: ...plied to you If you did not receive a copy or if you have a question regarding anything covered in this manual contact your local sales representative USER GROUP 2 12 RECOMMENDED CREW At least 2 peopl...

Page 2: ...ame Full bucket seats require a 2 5 label all other seats require a 5 12 label For safety reasons do not attach swing chains or seats to swing frame until playground is ready to open NOTE Swing seats...

Page 3: ...sembly Center SH 51 on swing top bar NOTE Center of SH 51 will be 92 5 8 from center of vertical post Attach SH 51 to top bar of swing frame by inserting bolts down through swivel halves Secure bottom...

Page 4: ...ES DATE 08 29 2014 INSTALLATION GUIDELINES Page 4 of 20 FOOTING LAYOUT 3 5 ARCH FRAME ONE BAY FOOTING LAYOUT 3 5 ARCH FRAME TWO BAY FOOTING LAYOUT 3 5 ARCH FRAME THREE BAY FOOTING LAYOUT 3 5 ARCH FRAM...

Page 5: ...DATE 08 29 2014 INSTALLATION GUIDELINES Page 5 of 20 FOOTING LAYOUT 5 ARCH FRAME ONE BAY FOOTING LAYOUT 5 ARCH FRAME TWO BAY FOOTING LAYOUT 5 ARCH FRAME THREE BAY FOOTING LAYOUT 5 ARCH FRAME FOUR BAY...

Page 6: ...FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 6 of 20 FOOTING LAYOUT 5 TIRE FRAME ONE BAY FOOTING LAYOUT 5 TIRE FRAME TWO BAY FOOTING LAYOUT 5 TIRE FRAME THREE BAY FOOTING LAYOUT 5 TIRE FRAME FO...

Page 7: ...frame The 2 3 8 x168 swing legs are used for the 10 tri pod swing The swing legs with bend are used for the ends of the tripod 2 3 8 x136 with bend for the 8 tri pod and 2 3 8 x168 with bend for the 1...

Page 8: ...e a 2 5 label all other seats require a 5 12 label For safety reasons do not attach swing chains or seats to swing frame until playground is ready to open NOTE Swing seats and chains sold separately B...

Page 9: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 9 of 20 BI POD FOOTING ONE BAY BI POD FOOTING TWO BAY BI POD FOOTING THREE BAY BI POD FOOTING FOUR BAY...

Page 10: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 10 of 20 8 TRI POD FOOTING ELEVATION END 8 TRI POD FOOTING ELEVATION SIDE 8 TRI POD FOOTING ONE BAY 8 TRI POD...

Page 11: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 11 of 20 8 TRI POD FOOTING TWO BAY 8 TRI POD FOOTING THREE BAY 8 TRI POD FOOTING FOUR BAY...

Page 12: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 12 of 20 10 TRI POD FOOTING ELEVATION END 10 TRI POD FOOTING ELEVATION SIDE 10 TRI POD FOOTING ONE BAY 10 TRI POD...

Page 13: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 13 of 20 10 TRI POD FOOTING TWO BAY 10 TRI POD FOOTING THREE BAY 10 TRI POD FOOTING FOUR BAY...

Page 14: ...r Make sure both sides of saddle receiver are evenly spaced No more than 2 threads may be showing Tighten hardware Vertical Post 3 8 Rectangular Weld Nut 3 8 x1 3 4 Security TORX Bolt 1 4 x1 Drive Pin...

Page 15: ...hanger tabs at 6 00 Install and tighten set screws see Detail C Top Rail Top Rail 1 2 x3 4 Set Screw 1 4 x1 Drive Pin top of one receiver bottom of other 1 4 x1 Drive Pin top of one receiver bottom o...

Page 16: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 16 of 20 FOOTING ELEVATION SINGLE 5 POST SWING FRAME...

Page 17: ...LATION GUIDELINES Page 17 of 20 SINGLE 5 POST FRAME ONE BAY SINGLE 5 POST FRAME TWO BAY SINGLE 5 POST FRAME THREE BAY SINGLE 5 POST FRAME FOUR BAY 138 18 X36 DEEP 138 18 X36 DEEP 138 138 18 X36 DEEP 1...

Page 18: ...Post 3 8 x2 Security TORX Bolt 3 8 Rectangular Weld Nut 1 4 x1 Drive Pin Installed in Step 6 New 5 Receiver 1 4 x1 Drive Pin Installed in Step 6 Existing 5 Receiver Detail A STEP 4 Select vertical po...

Page 19: ...rive Pin STEP 6 Select five 1 4 x1 drive pins Drill one 1 4 hole in each post through back of saddle and two 1 4 diagonal holes through opposite sides of each receiver in the flat area by attachment h...

Page 20: ...swings at rest shall be no less than 24 when measured at 60 above the protective surfacing The horizontal distance between the supporting structure and the adjacent to fro swing seat shall be no less...

Reviews: